The Cairo Project
The Cairo project consists of 5 claims (1000 hectares) in the north central portion of the Cairo Township in Ontario. In February, 2009 the Company completed a blasting and sampling program in the area of a historic copper showing on the property. Quartz veining ranging from 12 cm to 56 cm was uncovered in three of the blast locations over a distance of approximately 50 feet. Samples from the blast material yielded galena-chalcopyrite-lead mineralization ranging from 2% to 40% galena and chalcopyrite. The higher values obtained in one of the blast pits appears to occur at the intersection of two structures or at an inflection of the main vein with a splay vein. The second vein adjoining the main vein appears to contain approximately 40% galena.
On the recommendation of the Company's geologist, the Company intends to undertake a program consisting of geophysics and channel sampling during the spring field season to determine the direction and extent of the mineralization.

